<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Detroit water board puts $1.45 billion infrastructure plan on the table, with east-side lead line work next	</title>
	<atom:link href="https://111things.com/local-headlines/detroit-water-board-puts-1-45-billion-infrastructure-plan-on-the-table-with-east-side-lead-line-work-next/feed/" rel="self" type="application/rss+xml" />
	<link>https://111things.com/local-headlines/detroit-water-board-puts-1-45-billion-infrastructure-plan-on-the-table-with-east-side-lead-line-work-next/</link>
	<description>Ask follow up questions &#38; get instant answers and insights.</description>
	<lastBuildDate>Sun, 19 Apr 2026 03:19:09 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>
</channel>
</rss>
