Lynchburg Finishes Drilling Phase of Blackwater CSO Tunnel
Lynchburg says crews have completed drilling for the Blackwater CSO tunnel, a major wastewater project linking downtown with the CSO 52 site.
Lynchburg says crews have completed drilling for the Blackwater CSO tunnel, a major wastewater project linking downtown with the CSO 52 site.