US-20 work between Stuart and Atkinson still affecting drivers late June
Atkinson drivers on US-20 between Stuart and Atkinson still face NDOT traffic controls—flaggers/AFAD and a pilot car—into the work zone.
Atkinson drivers on US-20 between Stuart and Atkinson still face NDOT traffic controls—flaggers/AFAD and a pilot car—into the work zone.
Atkinson, NE drivers on US-20 between Stuart and Atkinson should expect intermittent lane closures, pilot-car control and slower trips through mid-July.