Chubu Electric to Withdraw Hamaoka Restart Applications After Safety Review
Chubu Electric will withdraw restart applications for Hamaoka Units 3 and 4 after an investigation into seismic evaluations; two top executives will resign Sept. 30.
Chubu Electric will withdraw restart applications for Hamaoka Units 3 and 4 after an investigation into seismic evaluations; two top executives will resign Sept. 30.
Congress is reviewing a proposed 30-year U.S.-Saudi nuclear pact, with lawmakers focused on enrichment limits, inspections and Trump’s Israel condition.
The classified U.S.-Saudi nuclear pact entered Congress’s 90-day review on August 24, while enrichment, safeguards and an Israel condition remain unsettled.
The Army selected five companies for planned microreactors at five bases, with up to $2.2 billion in milestone funding and a Sept. 30, 2028 target.
The ordinance creates a regulatory framework for temporary workforce housing tied to construction of TerraPower’s Natrium project, but the camp is not reported as built or occupied.
Oklahoma is one of five states continuing to explore a federal nuclear campus that could include reactors, fuel-cycle work and radioactive-waste activities. No site, award or construction commitment exists.
Tennessee is a potential host for a proposed federal Nuclear Lifecycle Innovation Campus, with Oak Ridge identified as the state’s premier site. The federal process remains preliminary: no final host location, campus scope or new Oak Ridge waste facility has been approved.
United States Federal Watchdogs and Public Spending – GAO: DOE has 270 open recommendations, including 24 “priority open,” covering nuclear, cleanup, energy.
DOE’s June 23 conditional $17.5B loan package aims to speed 10 AP1000 reactors by up to 3 years—if technical, legal and financial reviews clear.
Covert MI residents who may be affected have until April 28 to ask for a hearing on early work tied to proposed new reactors at Palisades.