Route 151 resurfacing continues through Aug. 21 near Moodus and East Haddam
Connecticut DOT is milling and resurfacing 5.96 miles of Route 151 from the East Haddam-Haddam town line through East Hampton, with work scheduled through Aug. 21, 2026.
Connecticut DOT is milling and resurfacing 5.96 miles of Route 151 from the East Haddam-Haddam town line through East Hampton, with work scheduled through Aug. 21, 2026.
The continuous Route 149 closure at Bridge No. 02698 over Dykas Brook is scheduled to end Aug. 17, but the broader replacement project is scheduled to continue through Oct. 20, 2026.