Sebastian Inlet Bridge Replacement Moves Into Multiyear Construction Phase
FDOT says post-letting and pre-construction work is ongoing on the approximately $102 million SR A1A bridge replacement. Drivers should retain a crossing over Sebastian Inlet, but changing work zones, possible nonpeak lane closures and reduced park access are expected through a schedule now listed through fall 2031.