WIS 161 Resurfacing and ADA Work Underway in Iola, With Local Access Maintained
WisDOT is resurfacing 10.3 miles of WIS 161 and rebuilding pedestrian curb ramps in Iola during the 2026 construction season. Separate village chip-sealing work affects two local street segments.