Burbank authorizes $6.22 million downtown sidewalk grant
A 5-0 vote authorizes a Metro grant agreement for three San Fernando Boulevard blocks; the project remains in design, with construction estimated for 2028.
A 5-0 vote authorizes a Metro grant agreement for three San Fernando Boulevard blocks; the project remains in design, with construction estimated for 2028.