Clinton sewer repairs on Trailwood & Hollyberry start July 13; expect short closures
The City of Clinton Public Works Department says it will begin a sewer line replacement project on Monday, July 13, 2026, along Trailwood Drive and Hollyberry Drive. The project is expected to take approximately 1½ to 2 weeks, weather permitting.
During construction, motorists should expect specific partial road closures and intermittent full road closures in the project area. Residents and commuters are encouraged to plan ahead and use the recommended detour via Spanish Oak Drive and Pebble Lane whenever possible to avoid delays.
What’s being replaced and why
The city says the project is necessary to replace a section of deteriorated concrete sewer line that has collapsed. The damaged pipe has restricted wastewater flow, creating the potential for sewer backups and overflows.
City officials believe the deterioration resulted from long-term exposure to hydrogen sulfide gas, which can form sulfuric acid and corrode concrete sewer infrastructure over time. Replacing the failed section is intended to restore reliable wastewater service, improve system performance, and help prevent additional infrastructure failures.
Traffic and access impacts
The city notes that closures may be intermittent, so travel times through the Trailwood/Hollyberry area may vary day to day. Motorists are reminded to use caution, follow posted traffic control devices, and watch for construction personnel.
What residents should do during the work
On the city’s sewer service page, homeowners are told they are responsible for maintenance and repairs to their home’s sewer laterals or lines. If residents suspect or experience a sewer blockage, the City of Clinton asks that the issue be reported to Clinton Public Works for inspection.
The city also asks residents to help protect local infrastructure by only disposing of appropriate waste items (human waste and toilet paper). To report a sewage issue or improper disposal—or to get more information about city services—contact Clinton Public Works at 601-924-2239.
Related city agenda context
On July 21, 2026, the City of Clinton’s agenda included public works engineering-related items tied to sewer work, including services associated with a Trailwood Apartment Complex sewer project.
As the replacement work moves through the expected 1½- to 2-week window, residents are encouraged to follow on-site traffic guidance and watch for any updates as conditions change.
Sources
- City of Clinton sewer line replacement notice (Trailwood Drive & Hollyberry Drive; start July 13; closures/detour details)
- Mississippi State Dept. of Health – Water system details for City of Clinton (MS0250003)
Look for updates to this story
Discover more from Interactive News
Subscribe to get the latest posts sent to your email.