Peoria sets Oct. 21 review of El Mirage Road design
Peoria and ADOT will present final-design plans for the El Mirage Road connection between Loop 303 and Jomax Road on Oct. 21. Public comments are due by Nov. 6.
Peoria and ADOT will present final-design plans for the El Mirage Road connection between Loop 303 and Jomax Road on Oct. 21. Public comments are due by Nov. 6.
A June 19 Arizona State Transportation Board agenda identifies new right-of-way needs for a US 60 traffic-interchange design change, but does not set construction timing or confirm local closures.
A one-mile eastbound passing lane east of Peridot remains planned for summer 2026, but ADOT has not posted a specific opening date.