DOE Order 202-26-35 for PJM grid reliability: what to watch (July 14–21)
DOE Order 202-26-35 is in effect July 14–21 for PJM reliability during the heat peak, directing unit dispatch and authorizing backup power as needed.
DOE Order 202-26-35 is in effect July 14–21 for PJM reliability during the heat peak, directing unit dispatch and authorizing backup power as needed.