Lake Orion businesses organize recovery after May water-main break
A 42-inch water-main break disrupted service in Lake Orion and Orion Township on May 10. After reopening, local groups planned recovery events for affected businesses.
Roads, transit, utilities, broadband, housing, construction, zoning, public works, ports, rail, and capital projects.
A 42-inch water-main break disrupted service in Lake Orion and Orion Township on May 10. After reopening, local groups planned recovery events for affected businesses.
The DeKalb City Council approved annexation, zoning and development plans for an approximately 114-acre project at Peace Road and Fairview Drive.
Nisswa was not selected for a requested $4.8 million federal contribution toward a proposed $6 million water system near Highway 371 and County Road 77.
An Illinois Comptroller report documents five Onarga TIF project categories, including Route 54 lighting, Seminary Avenue sidewalks, Durham Park Pool repairs and sewer assistance.
Lake Oswego has released preliminary Foothills redevelopment concepts ahead of a City Council study session on Aug. 4 and a Planning Commission work session on Aug. 10, 2026.
The Shakopee City Council awarded a construction contract for lane changes, new pedestrian crossings and a sidewalk extension near Sweeney Elementary, Shakopee High School and Sun Path Elementary.
Krum closed Hopkins Road south of Victory Way on June 15 for a realignment project. The city expects the road to reopen before Krum ISD classes resume Aug. 12.
The Village Board approved three downtown zoning districts and related comprehensive-plan amendments on July 9, setting a new framework for future development near the Metra station and along Burlington Avenue and Quincy Street.
Construction is underway on Rio Grande City’s Britton Avenue Revitalization Project, funded by a $500,000 state grant awarded in 2024.
A 4-1 Georgetown Town Council vote pauses review of new cottage-housing proposals and sends the town’s ordinance to a working group for possible changes.
The Montpelier City Council voted unanimously on July 22 to authorize exclusive negotiations with DEW Properties, advancing the Country Club Road housing project without granting final approval or construction authorization.
Caltrans has advanced a planned 0.73-mile pedestrian and bicycle project along Highway 135 intended to connect Los Alamos homes, downtown and Olga Reed Elementary School.
The Village of Lexington announced a roadway redesign for Main Street between Castor Road and Plymouth Street, with fewer through lanes, a center turn lane and bike lanes planned for both sides.
Joint resurfacing on Ridgebury Boulevard began during the week of June 11, 2026, and is scheduled to continue through August, with possible lane restrictions and travel delays.
Falcon Development acquired 115 acres in Rocky Mount for about $4.5 million and is pursuing a mixed-use project with housing, apartments and retail.
Mooresville High School started the 2026-27 school year with revised parking access from three streets, a change intended to improve traffic flow and student safety.
San Jacinto proposed water-rate changes and scheduled a Proposition 218 hearing for Aug. 4, but the available records do not confirm a final council decision.
West Sacramento published a draft plan for housing and community development from 2026 through 2030, beginning a public review process before adoption.
New Brunswick has opened bidding for Phase III of its Jersey Avenue water-main replacement project, with proposals due August 26, 2026.
Louisville officials are considering a temporary pause on some new data-center approvals while the city reviews land-use rules, safeguards and neighborhood impacts.
Mayor Helena Moreno’s new Canal Street strategy combines safety, repairs, business recruitment, vacant-space reuse and beautification in phases.
Pittsburgh received a $2.3 million infrastructure award as its 2026 capital budget directs nearly half of spending to engineering and construction.