Lake Villa village board receives CMAP NEXT implementation plan
The Chicago Metropolitan Agency for Planning presented an updated NEXT Program implementation action plan to the Lake Villa Village Board on July 10, 2026.
The Chicago Metropolitan Agency for Planning presented an updated NEXT Program implementation action plan to the Lake Villa Village Board on July 10, 2026.
A Wisconsin DOT transportation program lists a $4 million-to-$4.999 million resurfacing and reconstruction project for STH 167, or Holy Hill Road, between STH 175 and Interstate 41 in the Village of Richfield.
A Missouri transportation project list places Route 171 intersection improvements from the Kansas state line to Fir Road in a June 2025–June 2029 scoping and design window.
Marysville is considering repeal of its 2001 116th Street Master Plan while retaining a 38th Drive NE connection. Comments on the environmental determination are due Aug. 5, with appeals due Aug. 6.
Pittsburgh residents and commuters have until Aug. 7 to respond to the city’s mobility and roadway-safety survey, which is intended to inform future transportation policy, planning and investment decisions.
Garden Ridge residents weighed future Comal County road and safety priorities at a June open house; no project, schedule or funding was approved.
Yarmouth approved a $12,000 match for preliminary engineering on the proposed Portland-to-Yarmouth Casco Bay Trail segment; construction funding remains unsettled.
New Bern’s transportation planning agency is now countywide, keeping the city represented while changing how future road, transit and infrastructure priorities are coordinated.
Shoreline is studying safer walking and biking connections and a possible sports, recreation and entertainment overlay near the 185th Street station.
Macon residents can respond by August 6, 2026, to a Georgia DOT study of possible Atlanta-Savannah passenger rail service that could include Macon.
Conroe residents can rank proposed traffic-safety projects, report dangerous locations and review crash data as the city plan moves toward fall recommendations.
Austin TX – CapMetro bus workers authorized a potential strike after disputes over training, wages and bonuses, raising reliability concerns for fixed routes.
Trent Woods residents now fall under the Craven County MPO structure effective July 1, 2026, after the New Bern Area MPO transition. Next TAC: July 22.
Winston-Salem NC – WSATPO’s Regional Impact STIP list (27 projects) is open for feedback: a July 7 meeting plus an online points survey through July 13.
HSRA’s board adopted its Final 2026 Business Plan June 1, placing Bakersfield’s interim station north of 7th Standard Road—City leaders object.
Drivers on 154th Ave NE will see intermittent lane closures for paving operations starting Monday, July 6, through Monday, Aug. 31, 2026. Here’s the corridor, scope, and planning tips.
Boise received a $503,125 federal IFAC planning grant to develop a funding strategy for restored intercity passenger rail and study Boise Depot-area investments.
Fayetteville NC – A proposed passenger rail link to Raleigh remains active, but state and federal records show the corridor is still in early planning, not construction.